Quantcast
Viewing all articles
Browse latest Browse all 11324

Tamedia - Shigeru Ban Architects

The project for the headquarters of the Swiss media company Tamedia is situated in the heart of the city of Zurich in a 1,000m2 site within a larger urban block where the main buildings of the group are currently located. The site is positioned towards the east part of the block and has the particularity of developing through almost 50m of linear façade facing the Sihl water canal.

Image may be NSFW.
Clik here to view.
Tamedia-046_large

The implantation of the new building basically responds to the footprint of the existing building to be demolished but this time creating continuity with the facades of the buildings beside as well as taking advantage of the maximum allowed height in order to optimize the exploitable office area in this side of the building block.

Image may be NSFW.
Clik here to view.
Tamedia-052_large

The main access of the building is situated in the north angle of streets Werdstrasse and Stauffacherquai and will actually become the principal entry of the whole building complex. The building develops within 7 stories over ground floor with two basement levels for a global net area of 8,602m2 to which we can add 1,518 additional square meters that correspond to the two-floor extension project located on the roof of the neighbor building at number 8 of Stauffacherquai street.

Image may be NSFW.
Clik here to view.
Tamedia-094_large

From an architectural point of view one of the main features of the project is indeed the proposition of a main structural system entirely made designed on timber that, other its innovative character from a technical and environmental standpoint, gives the building a unique appearance from the inside space as well as from the city around. In order to reinforce and express this idea the building skin is entirely glazed and special attention was given to achieve a low energy transmission levels that responds to the latest and very strict Swiss regulations in terms of energy consumption.

Image may be NSFW.
Clik here to view.
Tamedia-103_large

Facing the city, the building also features an “intermediate” space throughout the whole height of the east façade that other its role as “thermal screen” within the general energy consumption strategy, also becomes a unique spatial experience with lounge areas and connection vertical links between the different office stories. These “balconies” can be used as informal meeting and rest areas that will also have the particularity of having a façade composed of a glass retractable window system that allow to “transform” these spaces into open air terraces that reinforce the privileged relationship between the interior building and its surrounding landscape.

Image may be NSFW.
Clik here to view.
Tamedia-122_large

Innovation:
The timber main structural system is in great extent the most significant innovation of the project. From a technical and environmental point of view the proposed this timber structure is a unique response to this type of office building and the fact that the structural elements are entirely visible also gives a very special character and high quality spatiality to the working atmosphere.

Image may be NSFW.
Clik here to view.
Tamedia-113_large

Sustainability:
Besides the clear contribution to sustainability on the choice of timber as the main structural material (only renewable construction material and the lowest C02 producer in construction process) the global mechanical system has been designed to meet the highest standards in energy issues(The intermediate space other its “thermal barrier” function is part of the public spaces that will be heated and cooled with the extraction air from the office area)

Image may be NSFW.
Clik here to view.
Tamedia-142_large

Site Area: 1000m2, (Total Site Area: 8000m2)
Building Area: 1000m2
Total Floor Area (New building and extension floor): 10120m2
Structure: Timber structure, Reinforced concrete
Design Date: April 2008 – December 2010
Construction Date: Start of demolition February 2011
Start of construction May 2011
Completion of construction March 2013

Image may be NSFW.
Clik here to view.
Tamedia-144_large

Image may be NSFW.
Clik here to view.
Tamedia-125_large

Image may be NSFW.
Clik here to view.
Tamedia-160_large

Image may be NSFW.
Clik here to view.
Tamedia-164_large

Image may be NSFW.
Clik here to view.
Tamedia-187_large

Image may be NSFW.
Clik here to view.
Tamedia-167_large

Image may be NSFW.
Clik here to view.
A2_large

Image may be NSFW.
Clik here to view.
B1_large

Image may be NSFW.
Clik here to view.
B2_large

Image may be NSFW.
Clik here to view.
B3_large

Image may be NSFW.
Clik here to view.
C4_large

Image may be NSFW.
Clik here to view.
D1_large

Image may be NSFW.
Clik here to view.
C2_large

Image may be NSFW.
Clik here to view.
D5_large

Image may be NSFW.
Clik here to view.
Zur01_detail_timber-structure_1-10_large

Image may be NSFW.
Clik here to view.
Zur01_me_east_1-400_large

Image may be NSFW.
Clik here to view.
Zur01_mp_0_1-400_large

Image may be NSFW.
Clik here to view.
Zur01_mp_attic_1-400_large

Image may be NSFW.
Clik here to view.
Zur01_mp_mezz_1-400_large

Image may be NSFW.
Clik here to view.
Zur01_mp_typical_1-400_large

Image may be NSFW.
Clik here to view.
Zur01_mp_site_1-1000_large

Image may be NSFW.
Clik here to view.
Zur01_ms_1_1-400_large

Image may be NSFW.
Clik here to view.
Zur01_ms_2-3_1-400_large


Viewing all articles
Browse latest Browse all 11324

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>